掃碼下載APP
及時接收考試資訊及
備考信息
Ø Benefits Map (收益流程圖)
A benefit map is a visual tool that can be used to assist in benefit management. It documents the way in which the benefits of the project relate to the project outcome and to the strategic objectives of the organisation. The map can then be used throughout the project to see the effects of changes in any of the project outcomes.
Typical steps in preparing a benefit map are:
1) Agree the objectives of the project and how these link to strategic objectives. This may involve discussion with stakeholders.
2) Identify the benefits of a project. Each benefit should then be linked to an objective of the project.
3) Identify business changes that are needed to achieve the benefits of the project. Typically, business changes are new ways of doing something.
4) Identify the project outputs (or enablers) that will bring about the business changes. This could typically be a new IT system.
All of the items identified above are drawn on a chart (the benefit map) with lines showing links between them. A simple benefits map is shown:
流程分為四步,第一步是確認項目收益的至終目標,這個需要跟利益相關者進行討論并達成一致;第二步,確認項目收益,每部分收益都應與項目目標相對應;第三步,確認關于達到預期項目收益過程當中的變動;第四步,確認至終的項目成果。
Copyright © 2000 - yinshua168.com.cn All Rights Reserved. 北京正保會計科技有限公司 版權所有
京B2-20200959 京ICP備20012371號-7 出版物經營許可證 京公網安備 11010802044457號